Sub-contracted within the project of rehabilitation and upgrade the WWTP in Al-Salt to develop the operational and environmental management plan including control philosophy. The main project client is WAJ, 36 M$ KFW-funded, and implemented by ATCCO with DORSCH as the Consulting Engineer.
The delivered plan included several perspective that addressed facility design, waste and sludge handling, quality assurance system, emergency response, maintenance checklist, operation and HSE procedures, nuisance control, inspection and monitoring process, instrumentation engineering, energy efficiency and optimization.
Year: 2024